| City of Yuma, AZ We were impressed with Jason, he represented your company very well on the job in Yuma. We’ve had vendors/workers in the past who show up, fumble around and are not totally familiar with their equipment. Not the case with Jason, he was professional, prepared and jumped right in and got started.
 
 Thanks, Craig
 Craig Hochheimer
 
 Utility Systems Supervisor
             
                 Oakridge National Laboratories – Department of Defense
 Oakridge, TN
 Optimech, LLC
 Many 8”, 10” and 12” Freezes and Linestops on the Kraken & Cray Super computers
 
 Dulles International Airport
 Virginia
 DMG Consultants / Turner Construction
 4 - 8” Simultaneous Freezes for Airport computers
 
 San Diego International Airport
 San Diego, CA
 Pacific Rim Mechanical
 8” Freezes and linestops on the Airport computers
 
 Smithsonian Air & Space Museum
 Washington, DC
 Calvert Mechanical
 14” Freeze on Chilled water
 
 NSA Computer Data Center
 Washington, DC
 Calvert Jones Co. Inc.
 Critical Data Pipe Freezing
 
 National Research Lab
 Washington, DC
 Critical copper pipe freezing
 
 AT&T  Central Computer & Billing Center
 San Diego, CA
 Contractor: R.J.Duam Const.
 Various line stopping, hot tapping and Pipe freezing on Condensate water
 
 Dept of Homeland Security, Immigration & Customs
 Los Angeles, CA
 D. Burke Mechanical
 4 – 16” Simultaneous Freezes on Chilled water
 
 Bank of America Data Center
 Brea, CA
 Various line stopping and hot tapping on data chilled water
 
 Bank of America Data Center
 Louisville, KY
 Comstock Brothers
 Various line stopping and hot tapping on data chilled water
 
 Fairchild Semiconductor, Inc
 Mountain Top, PA
 6” Critical Data Freezes Glycol
 
 Pfizer Corporation CB-2
 San Diego, CA
 Pacific Rim Mechanical
 Many 14”, 12” and 8” Critical Freezes and linestop
 
 Children’s National Hospital
 Washington DC
 Dominion Mechanical
 Various Critical Freezes
 
 Department of Justice - Federal Records Data Storage
 Complete Building Services
 Data Center Pipe Freezing
 
 NIST Computer Data Center
 Gaithersburg, MD
 Calvert Jones Co. Inc.
 Critical Data Pipe Freezing
 
 Washington & Lee University
 Lexington, VA
 K. Jellstrom & Lee
 Heating System Freezes
 
 Tennessee Valley Authority
 Raccoon Mountain, TN
 Critical System Freezing
 
 Smithsonian Air & Space Museum,
 Washington, DC
 14” Chilled water
 
 Dept of Homeland Security, Immigration & Customs,
 Los Angeles, CA
 16” – Simultaneous Chilled water (4) Freezes
 
 Cal Poly
 San Luis Obispo, CA
 4” – Heating Hot water Freezes
 
 ESS Chill Water Systems
 Mexicali, B.C. Mexico
 8” – Heating Hot water Freezes
 
 Salt Lake Mormon Tabernacle
 Salt Lake City, Utah
 Various Freezes – Heating Hot water
                 National Institute of Standards and Technology - NIST
 Washington, DC
 Pipe Freezing of main data computer cooling system.
 Contractor – Calvert Jones
 
 US - Dept. of Justice - Office of Information
 Rockville, MD
 PipeFreezing of US information storage computer’s cooling system.
 Contractor – Complete Building Services
 
 Campbell Soup Company
 Camden, NJ
 PipeFreezing of corporate data cooling system.
 Contractor – FMA Construction
 
 Hershey Company – Y & S Candies - Swizzler
 Lancaster, PA
 PipeFreezing of Reactor Effluent system.
 Contractor – TAH Construction
 
 Fairchild Semiconductor, Inc
 Mountain Top, PA
 PipeFreezing of data cooling system.
 Performed directly for company
 
 City of Rowland Arkansas
 Littlerock, AR
 1 – Emergency 42” linestop on industrial water supply
 Contractor – Harper Construction, AR
 
 City of Lynchburg, VA
 1 – 30” linestop on Sewage Pump-station indoors 5 stories below ground
 Contractor – Hydro Tap, VA
 
 Tennessee American Water
 Chattanooga, TN
 1 – 30” High Pressure linestop on water supply
 Contractor – East Tennessee Grading
 
 And many more...
 |